Abwasserzweckverband Promnitztal - Sewage Treatment Works Radeburg |
|
|
| Design capacity: | 20.000 HV |
|
Dry weather flow: |
4.000 m³/d |
|
Saisonal campaign operation: |
Tourism of Moritzburg |
|
|
biological preparation with SBR process Sludge dehydration |
|
Type of Advertisment: |
Product mix |
|
Production costs: |
5.092.000,- € |
|
Construction period: |
2004 - 2005 |
|
Size of order elementis consult: |
Part VII HOAI: engineering work
|
| Order sum elementis consult: |
430.000,- € |
| Processing period: |
2000 – 2009/12 |