|
|
| Design capacity: | 600 HV |
|
Dry weather flow: |
180 m³/d |
|
|
treatment with ventilated previous pool. |
|
Type of Advertisment: |
detailed lump-sum contract |
|
Production costs: |
970.000,- € |
|
Construction period: |
2005 – 2006 |
|
Size of order elementis consult: |
Part VII, IX, II HOAI: engineering work
|
|
Amount of work elementis consult: |
Part VII HOAI: engineering work
|
| Processing period: |
2000 – 2006 |