|
|
| Design capacity: |
|
||||
|
Dry weather flow: |
9.120 m³/d | ||||
|
|
upstreamed - denitrification |
||||
|
Type of Advertisment: |
|
||||
|
Total production costs: |
ca. 10.200.000,- € |
||||
|
Construction period: |
|
||||
|
Size of order elementis consult: |
Immediate measure:
Total renovation:
|
||||
|
Order sum elementis consult: |
|
||||
| Processing period: |
|